Construction Site Manager with more then 08 years of experience in site supervision. Outstanding projects are done ahead of schedule and under budget. Highly-capable Site Manager with talents in direct project planning and management. Seeking a challenging position in construction field (Construction Management) in a progressive organization, to steer the organization in the right direction by investing all my post qualification and professional expertise, valuable experience to the optimum level, to facilitate mutual growth for both, the organization and personnel career
Process Plant (Tobacco)
labour contract to built marlboro cigarettes processing plant.
Total Project Cost: USD 100,000.
T M J Hospital cum Residential Complex .Morogoro
- Total Project Cost: USD 400,000.
PROJECTs:
- Heavy metal contamination on black cotton soil, and
- Study of geotechnical properties of fertilizer contaminated soil.
SEMINARs:
- Wastewater treatment plant,
- Rainwater harvesting, and
- Reinforced Cement Concrete (R. C. C.) Roads.
Industrial Visits- Housing Complex (Duplex and Apartments) constructions, Vadodara,
- Bridge construction, Vadodara,
- Hydropower generation at KADANA DAM, Gujarat,
- Purification and supplying of water at French well, Vasad,
- Water treatment process plant at NIMETA, Vadodara,
- Sewage treatment process plant, GAJRAWADI, Vadodara,
- Rain Water Harvesting System at Sevatirth, Jamva,
- Bio-Gas Plant at Sevatirth, Jamva, and
- Waste water process treatment plant, G S F C (a large fertilizer manufacturing unit).