Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic
Ivan Theophily

Ivan Theophily

Industrial and Mechanical Engineering
Kigamboni,Dar es Salaam

Summary

Strong leader and problem-solver dedicated to streamlining operations to decrease costs and promote organizational efficiency. Uses independent decision-making skills and sound judgment to positively impact company success. Collaborative leader with dedication to partnering with coworkers to promote engaged, empowering work culture. Documented strengths in building and maintaining relationships with diverse range of stakeholders in dynamic, fast-paced settings.

Overview

9
9
years of professional experience
3
3
Languages

Work History

Assistant Manager

Lake Cement Ltd
10.2020 - Current
  • Responsible for all maintenance and projects supervision in the plant.
  • Control Inventory for maintenance department.
  • Ensure proper utilization of resources and manpower.
  • Preparation of maintenance budget.
  • Comply to meet target KPI for the department.

Achievements

  • Erection of bridge reclaimer which improve production quality.
  • Selection, Erection and commission of mineral sizer (MMD) lead to increase of production by 100TPH.

Senior Maintenance Engineer

Lake Cement Ltd
01.2018 - 10.2020
  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Visually inspected and tested machinery and equipment, performing routine preventive maintenance.
  • Dismantled defective machines and equipment and installed new or repaired parts.
  • Organized and directed maintenance shutdowns and startups.
  • Documented maintenance activities and confirmed compliance with relevant regulations.
  • Cleaned and lubricated parts to keep equipment operating at peak performance.

Achievements

  • Erection and commission of Pfister pump led to increase of clinker production by 500tons.

Maintenance Planning Engineer

Lake Cement Ltd
01.2017 - 12.2017
  • Assist with the preparation of Scheduled Outage, Project and departmental budgets.
  • Maintain the integrity of the computerized maintenance management system by providing guidance for system administration functions.
  • Develop cost, schedule, performance criteria, and estimated work force requirements for job cost analysis.
  • Ensure development and maintenance of documentation required by management, insurance representatives, and auditors by maintaining records of all activities.
  • Keep maintenance historical records to facilitate efficient and comprehensive planning and scope development of future work.
  • Optimize maintenance planning system to ensure efficient use of work force at each facility.
  • Develop and maintain a quality review process for data entered into the E.R.P (ORION).
  • Selects the most appropriate techniques and logical sequence of activities to complete project scope.
  • Inputs the work breakdown structure information in means to assess an accurate forecast on time, resources and cash flow of the project.

Achievements

  • Increased cement production by 200tons using raw mix dust.

Maintenance Plant Inspector

Lake Cement Ltd
01.2016 - 12.2016
  • Perform checklist of various equipment in each plant section according to the manufacture recommendation.
  • Prioritize findings according to the nature and impact of the problem to the equipment or production process.
  • Tight Co-ordination with Maintenance Execution (to get feedback from maintenance team on equipment status) and Planning / (Scheduling).
  • Measure and monitor equipment conditions, analyze trends, and identify the needs for Mechanical maintenance taking into account production constraints.
  • Permit operations to describe and control timing of work to be done.
  • Planning maintenance work orders, the repairs, servicing and efficient functioning of all machinery and equipment in a plant.

Achievements

  • Serving Severe damage on cement mill pinion and production loss approx 80,000tons

Cement Mill Engineer

Lake Cement Ltd
02.2015 - 12.2015
  • Overseeing maintenance of conveyor belts, bearings and lubrication systems.
  • Leakage arresting in flanges, control feeders, diverting gates and servicing of machines.
  • Conducting regular inspections of machines,
  • Making maintenance plans and making a follow up on the quality of maintenance done.
  • Assigning duties and supervising technicians, welders and helpers.

Achievements

Running cement mill in six months without breakdown.

Education

Bachelor of Science - Industrial Engineering And Management

UNIVERSITY OF DAR ES SALAAM
Dar Es Salaam, Tanzania
11.2014

Skills

  • Operations Management
  • Employee Scheduling
  • Cost Reduction
  • Project Management
  • Negotiation
  • Staff Supervision
  • Time management
  • Task prioritization
  • Staff training and development
  • Problem-solving abilities

Additional Information

REFEREE

Eng. Ismail, Waya

Mechanical Manager

P.O BOX 40707 DSM

+255754297868

Eng. Petro Limu

Ass. Lecture

University Of Dar Es Salaam

+255785535368

Rev. Prof Festo L Bahendwa

DP-ADMINISTRATION JoKUCO-KAGERA

+255746321567

Timeline

Assistant Manager

Lake Cement Ltd
10.2020 - Current

Senior Maintenance Engineer

Lake Cement Ltd
01.2018 - 10.2020

Maintenance Planning Engineer

Lake Cement Ltd
01.2017 - 12.2017

Maintenance Plant Inspector

Lake Cement Ltd
01.2016 - 12.2016

Cement Mill Engineer

Lake Cement Ltd
02.2015 - 12.2015

Bachelor of Science - Industrial Engineering And Management

UNIVERSITY OF DAR ES SALAAM
Ivan TheophilyIndustrial and Mechanical Engineering