Work Preference
Professional Summary
Overview
Work History
Education
Skills
Affiliations
Interests
4.KEY TRAINING ATTENDED
Timeline
Open To Work

HONEYWICK MILTON KALENGE

DANGOTE CEMENT LIMITED
TANGA

Work Preference

Job Search Status:

Open to work

Work Type

Full Time

Location Preference

On-Site
28
years of professional experience
11
years of post-secondary education

Senior Mechanical Engineer leading preventive and breakdown maintenance, spare parts planning, and reliability improvements for cement plant equipment. Directs engineers and technicians on 15–20 failure analyses per year, shutdown planning for 3–6 planned maintenance shutdowns per year, and mechanical upgrades that improve uptime and safety. Trains 20–30 staff on VRM technology, bearing systems, conveyors, welding, and bag filter maintenance while coordinating critical spares and budgeted MTBF and MTTR targets.

Work History

Senior Mechanical Engineer

5 Years 7 Months
DANGOTE CEMENT LIMITED | 01.2021 - Current
  • Led workforce training in operation and preventive maintenance of equipment to enhance team capabilities.
  • Responsible for all spare parts planning and maintaining budgeted MTBF and MTTR for section.
  • Lead the team of engineers for supervision of maintenance and timely completion of maintenance activity.
  • Planning and implementing preventive and breakdown maintenance schedule of mechanical equipments for improving overall reliability and safety of machinery.
  • Conducting failure investigation and take corrective action to reduce equipment downtime and maximum availability for plant operation.
  • Planned and assigned resources for daily monitoring, breakdown, and shutdown tasks.
  • Executed upgrades and modifications to existing systems, improving operational efficiency in cement production.
  • Achievements:
  • I have trained Engineers and Technician about Vertical Mill Technology (VRM), bearing technology, belt conveyors maintenance, welding technology and bag filter maintenance.
  • I have been preparing Detail planning of planned preventive maintenance (PM) and Shutdown activities are done accordingly.
  • I have been involved in various investigation of failure analysis such as reclaimer u scraper failure and roller tire failure analysis, kiln shell deformation and crusher grate bars failure analysis.
  • Implemented modifications to raw mill hopper, reducing manpower needs for maintenance across shifts and minimizing downtime from cleaning-related breakdowns.

Mechanical Maintenance Superintendent

6 Years
TANGA CEMENT PLC | 01.2015 - 01.2021
  • Manage the activities of all routine and AD HOC Condition Based Maintenance (CBM), Predictive (PdM) and Precision Maintenance on all critical equipment.
  • Manage the activities of maintaining data in the Preventive Maintenance System (PMMS) and various CBM, PdM and preventive maintenance technique database.
  • Ensure the availability of the precision maintenance measurement tools and required measurement skills are available.
  • Ensure that all measurement campaign is set up correctly in the PMMS, CMMS and various CBM, PdM and Precision maintenance systems.
  • Ensure Precision data collection is done using advanced portable data collector’s tools and analysis and diagnosis on the condition and failure mechanism of equipments is done.
  • Follow up spares availability by initiating requirements and follow up delivery in collaboration with procurement team.
  • Actively participate in reliability improvements programs such as CAPEX projects.
  • Achievements:
  • All Condition Based Maintenance, Predictive Maintenance and Precision Maintenance were done as per procedure.
  • New tools for data collection and precision maintenance such as Data Logger and Lase Alignment tools were purchased.
  • Two technicians were sent for CAT 2 training and certified to do SPM analysis which helped to breach the contract with third party company to do analysis.
  • Condition Based Maintenance for various equipments such as bucket elevators, belt conveyors, ball mills and vertical mills and crushers were set and helped to know the condition of equipments, when spares are required to be ordered and when new spares need to be installed.
  • Delivery of critical spares as per requirements.
  • Many equipments were overhauled and improved overall equipments efficiency (OEE) by preparing various CAPEX projects and supervised execution such as bucket elevators overhaul, vertical and ball mills internals overhaul and cement mill #2 gear box overhaul.

Head of Mechanical Maintenance

3 Years
TANGA CEMENT PLC | 01.2012 - 01.2015
  • Support the Maintenance Manager to plan and manage all mechanical Maintenance activities.
  • Investigate process problems and make recommendations on changes to process operating procedures.
  • Coordinate and assign all mechanical activities to mechanical team.
  • Ensure all preventive maintenance routine (PMR) are done effectively and feedback on planning meetings.
  • Follow up critical spares requirements and communicate with procurement for close delivery.
  • Achievements:
  • All mechanical maintenance activities were planned and managed accordingly.
  • Process problems were identified, rectified and changes were made in process operating procedure.
  • They were delivery of critical spares as per requirements.
  • Preventive maintenance routine (PMR) was done effectively which improved many equipment reliability and OEE improved, hence high productivity and profit to the company.

Mechanical Supervisor

4 Years
TANGA CEMENT PLC | 01.2008 - 01.2012
  • Supervise maintenance activities as per plan work orders.
  • Assign fitters/welders PMR inspections and maintenance execution activities.
  • Organize works for artisans to complete scheduled tasks, modifications and repair works timely and to high standards.
  • Ultimate responsible for safe working procedures.
  • Achievements:
  • All maintenance activities were supervised accordingly.
  • All maintenance activities were done timely and to high standards.
  • Risk assessments were prepared to all tasks and discussed with artisans before work commences which helped to work at safe conditions all time.
  • Successfully replaced two kiln sections for line 1 after 30 years of operations under my supervision.

Mechanical Technician

3 Years
TANGA CEMENT PLC | 01.2005 - 01.2008
  • Perform mechanical maintenance by providing technical services to optimize cost, equipment availability and customer satisfaction.
  • Carry out inspection to check list, repairs and modification and report all findings in daily meetings.
  • Fault findings, diagnose and repair equipments to the highest standard to minimize breakdown and minimize maintenance cost.
  • Achievements:
  • Equipment availability were improved by minimizing breakdown and minimize maintenance cost hence customer satisfaction attained.
  • Fault were traced and inspection done which helped to know the fault of the equipment before failure.
  • Successfully commissioned the first Vertical Loesche Mill for coal mill in the plant and be the trainer for other employees.

Mechanical Technician

3 Years
MBEYA TEXTILE MILLS | 01.1999 - 01.2002
  • Perform mechanical maintenance by providing technical services to optimize cost, equipment availability and customer satisfaction.
  • Carry out inspection to check list, repairs and modification and report all findings in daily meetings.
  • Fault findings, diagnose and repair equipments to the highest standard to minimize breakdown and minimize maintenance cost.
  • Achievements:
  • Equipment availability were improved by minimizing breakdown and minimize maintenance cost hence customer satisfaction attained.
  • Fault were traced and inspection done which helped to know the fault of the equipment before failure.

Education

Postgraduate Diploma - Engineering Management

University of Dar Es Salaam | 08.2012 - 11.2013
Award

Advanced Diploma - Mechanical Engineering

Mbeya Institute of Science And Technology | 08.2002 - 05.2005
Award

Full Technician Certificate - Mechanical Engineering

Mbeya Technical College | 01.1996 - 12.1998
Award

Certificate of Secondary Education

Iyunga Technical Secondary School | 01.1991 - 12.1994
Award

Skills

Preventive and predictive maintenance techniques
Condition-based maintenance
Failure analysis
Root cause analysis
Reliability engineering
Maintenance planning and scheduling
Spare parts planning
Shutdown planning
CMMS
Welding technology and practice
Lubrication management

Affiliations

  • Registered Professional Mechanical Engineer (PEng. No. 6407) with Engineers Registration Board (ERB).
  • Member of Institution of Engineers Tanzania (MIET).

Interests

Watching Football
listening to music and learning new technology.

4.KEY TRAINING ATTENDED

  • International Maintenance Seminar (2010 IMS) held in Copenhagen – Denmark in October 2010.
  • Advanced Supervisory Training by Du Toit held in Mkongo Hotel Tanga in 2008.
  • Bearing Technology and Maintenance by SKF Kenya held at Tanga Cement Factory in 2007.
  • Root Cause Failure Analysis held in Port Elizabeth - South Africa in 2013
  • Reliability Afrisam Way Maintenance held in Lichtenburg - South Africa in March 2020.

Timeline

Senior Mechanical Engineer

DANGOTE CEMENT LIMITED
01.2021 - CurrentRead More

Mechanical Maintenance Superintendent

TANGA CEMENT PLC
01.2015 - 01.2021Read More

University of Dar Es Salaam

Postgraduate Diploma from Engineering Management
08.2012 - 11.2013Read More

Head of Mechanical Maintenance

TANGA CEMENT PLC
01.2012 - 01.2015Read More

Mechanical Supervisor

TANGA CEMENT PLC
01.2008 - 01.2012Read More

Mechanical Technician

TANGA CEMENT PLC
01.2005 - 01.2008Read More

Mbeya Institute of Science And Technology

Advanced Diploma from Mechanical Engineering
08.2002 - 05.2005Read More

Mechanical Technician

MBEYA TEXTILE MILLS
01.1999 - 01.2002Read More

Mbeya Technical College

Full Technician Certificate from Mechanical Engineering
01.1996 - 12.1998Read More

Iyunga Technical Secondary School

Certificate of Secondary Education
01.1991 - 12.1994Read More
HONEYWICK MILTON KALENGE