Summary
Overview
Work History
Education
Skills
Passport
Driving
Placeofdomicile
Summary Of Experience
Industryschoolcourses
Membershipassociation
Personal Information
Languages
References
Hobbies and Interests
Timeline
Generic

Ernest Mziray

Iringa

Summary

A Drilling Supervisor with 38 years of diversified drilling experience. I have a supervisory experience of extensive drilling of water wells with successful completion within planned cost and time goals with less supervision from head office. I have supervised the drilling and completions of hundreds of water boreholes for domestic, agricultural, commercial, cattle ranches and other specialized industrial customers throughout our country (Tanzania). My expertise stems from various Professionals in groundwater field (foreign & local). I’m capable to plan, organize day to day drilling activities and monitoring the development of work, preparation of daily, weekly and monthly reports, as well as report presentation. I’m sufficiently experienced in all aspects of water drilling projects. Ordering materials and equipment required for borehole construction. Organizing and controlling the rig crew, monitoring the daily activity, communicating with clients, consultants and Head Office. Supervision and inspection of drilling rigs, equipment and borehole construction and development. Planning camping, staff, materials as well as rig/equipment movement I have carried out Implementation of drilling all sizes (small to large diameter) of deep water boreholes using air/mud, coring,auger,odex, Down – the – Hole hammer DTH and cable tool methods with the use of number of rigs with yields up to 100,000 liters per hour. The borehole drilled through different geological formations in coast (sedimentary), crystalline basement rocks, and karoo (mainly sandstones) and in volcanic rock areas. I do pumping tests, installation, repair and maintenance of pumps, fishing of lost equipment in boreholes, borehole rehabilitation, preparation of drilling cost estimates and well completion reports. I can also impart theoretical and practical training of drillers (in the field/classroom) to improve Workmanship and increase in an improved well drilling techniques. I have trained many drillers in our country and after retirement from Civil Service, I still provide on line free advice to water well drillers and pump installers. I am also competent in selection of drilling rig, drilling accessories (Compressors, generators, drilling tools, mud pumps) and all type of borehole pumps for the water well projects. I maintained the production of highest quality boreholes executed with quality workmanship throughout the period of my occupation with the Government.

Overview

47
47
years of professional experience

Work History

Drilling Manager

Milembe Construction Construction Company Limited
Dar Es Salaam, Tanzania
2018 - Current
  • Analyzed geological data to determine optimal drilling locations and techniques.
  • Drilling and testing of large capacity water boreholes at Iringa District for ASAS Dairy Farms.
  • Well development of large capacity wells at Kisarawe 2 Dar es Salaam for DAWASA by Airlifting method from the wells has been successfully done through the entire depth of the screens
  • Run of conductor pipes for Noble Helium drilling project at Mbelele in Rukwa Region
  • Supervision of Drilling and completion of water supply boreholes for the several clients in different locations in Tanzania.
  • Online training of the water well drillers
  • Supervised and evaluated the performance of drillers and other personnel onsite.
  • Conducted regular maintenance checks on equipment to ensure proper functioning.
  • Compiled detailed reports regarding completed jobs as well as future goals.
  • Planned and coordinated drilling operations to ensure safety, efficiency, and cost effectiveness.
  • Inspected drill sites for safety compliance prior to commencement of work.
  • Trained new employees on safe working procedures when operating machinery.
  • Provided guidance in troubleshooting any mechanical issues that arose during drilling operations.
  • Investigated accidents or incidents occurring at drill sites in order to prevent similar occurrences from happening again.
  • Collaborated closely with engineers in order to develop suitable plans of action for different scenarios.
  • Developed strategies for overcoming technical challenges associated with drilling operations.
  • Communicated project updates regularly with upper management.
  • Ensured compliance with all applicable regulations and company policies.
  • Maintained records of daily activities, including volumes drilled, materials used.
  • Monitored well conditions to identify potential problems or hazards.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Reported project progress, site problems and labor status to supervisors.

Drilling and testing of large capacity water boreholes at Iringa District for ASAS Dairy Farms

§ Well development of large capacity wells at Kisarawe 2 Dar es Salaam for DAWASA by Airlifting method from the wells has been successfully done through the entire depth of the screens

§ Run of conductor pipes for Noble Helium drilling project at Mbelele in Rukwa Region

§ Supervision of Drilling and completion of water supply boreholes for the several clients in different locations in Tanzania.

§ Online training of the water well drillers

Zonal Manager (West Zone - Iringa, Mbeya, Rukwa, Katavi & Kigoma Regions)

Drilling and Dam Agency (DDCA)
Iringa, Mbeya, Rukwa, Katavi & Kigoma Regions
10.2013 - 01.2018
  • Supervise, direct and control all drilling activities and coordinating with regional/district/town water authorities and responsible officers and clients regarding drilling projects in the area.

Drilling Project Coordinator

Coast, Mtwara and Ruvuma Regions
Coast, Mtwara and Ruvuma Regions
01.1999 - 01.2002
  • Supervision and control execution of DDCA’s drilling projects in Iringa and Mbeya region
  • Among these; is water bottling plant (Maji Africa, Ihefu and Mbeya Spring)
  • Asas Dairies Farm Ltd, Tanzam Highway Road Rehabilitation Project, Iringa - Dodoma Road Rehabilitation Project.

Regional Drilling Officer

Iringa
Iringa
01.1995 - 01.1996
  • Control and supervise DDCA’s water well drilling projects in Iringa Region
  • Wells drilled for agricultural and dairy farms in Iringa district and as well as for Coal Exploration Project in Mchuchuma Ludewa Njombe Region.

Zonal Drilling Inspector

Drilling and Dam Agency (DDCA)
Mwanza, Shinyanga, Kagera and Mara Regions
07.1994 - 01.1995
  • Supervise, direct and control all drilling activities, Regional Drilling Coordinators, In - charge of drill rigs as well as coordinate with regional water authorities and responsible geologists, hydrogeologists, geophysicist, hydrologists and Senior Drilling Inspector and Senior Mechanical Inspector regarding drilling projects in the area.

Drilling Supervisor

Mtwara Lindi Rural Water Supply Project
Mtwara
01.1990 - 01.1994
  • Supervised the drilling and completions of hundreds of water boreholes for domestic, agricultural, commercial, cattle ranches and other specialized industrial customers throughout our country (Tanzania).

Drilling Counterpart

Mtwara Lindi Rural Water Supply Project
Mtwara
01.1986 - 01.1990
  • Drilling of water wells and pumps installation to provide sufficient water supply for the rural communities in Mtwara, Lindi, Masasi, Newala, Nachingwea, Liwale and Kilwa Districts.

Driller - In -charge

Ministry of Water
Dodoma
01.1982 - 01.1985
  • Village wells drilling program in Chunya, Mbarali and Mbozi District and drilling test holes in Mbozi District for Water Master Plan (Danida Water Project) Mbeya Region.

Driller

Ministry of Water
Dodoma
01.1978 - 01.1981
  • Drilled test boreholes to explore the possibilities of finding acceptable location for drilling production boreholes for the Dodoma Town (special emphasis placed for the Capital Development Authority CDA).

Education

Driller Trainee -

Water Wells Drilling Technology and Drilling Equipment Maintenance

Certificate of Secondary Education -

Form 1- IV Tanga Secondary School

Skills

  • Drilling Supervisor
  • Water Wells Drilling Technology and Drilling Equipment Maintenance
  • Constructing Safe and Sustainable Groundwater Wells
  • Resource Drilling Fundamentals
  • Maintenance of Deep Boreholes
  • Borehole Pumps
  • Entrepreneurship and Construction
  • Supervisory Management
  • Well Drilling and Air Compressor Maintenance
  • Training in Well Drilling, Pump Installation, and Maintenance
  • Computer Literacy
  • Drilling Manager
  • Drilling and testing of large capacity water boreholes
  • Well development
  • Run of conductor pipes
  • Supervision of Drilling and completion of water supply boreholes
  • Zonal Manager (West Zone - Iringa, Mbeya, Rukwa, Katavi & Kigoma Regions)
  • Supervise, direct and control all drilling activities
  • Drilling Project Officer
  • Supervision and control execution of drilling projects
  • Drilling Project Coordinator
  • UNICEF - DDCA Cooperation for Well Drilling and Construction

Passport

Valid Tanzania Passport

Driving

Valid Tanzania Driving License

Placeofdomicile

Same, Tanzania

Summary Of Experience

  • Drilling Manager - Milembe Construction Construction Company Limited 2018 To date Drilling and testing of large capacity water boreholes at Iringa District for ASAS Dairy Farms Well development of large capacity wells at Kisarawe 2 Dar es Salaam for DAWASA by Airlifting method from the wells has been successfully done through the entire depth of the screens Run of conductor pipes for Noble Helium drilling project at Mbelele in Rukwa Region Supervision of Drilling and completion of water supply boreholes for the several clients in different locations in Tanzania. Online training of the water well drillers Zonal Manager (West Zone - Iringa, Mbeya, Rukwa, Katavi & Kigoma Regions) – Drilling and Dam Agency (DDCA) October 2013 – 2018 Supervise, direct and control all drilling activities and coordinating with regional/district/town water authorities and responsible officers and clients regarding drilling projects in the area. Special Assignment: 1. Hope Village Organization Ruvuma Region Water Well Project at Lutukira Village 80km North of Songea, Ruvuma. Scope of work comprised:
  • Geophysical survey of the site
  • Supervision wells drilling, pumping test and installation of pumps. 2. Iringa District Project. I supervised the drilling and completion of 7 boreholes equipped with pumps at Mawindi, Makatapora, Kinyali, Kihorogota, Mnadani, Izazi and Makadupa village. The execution of project and development in the field followed to the appropriate contract specifications as referred to the recognized Government water supply borehole drilling standards. 3. Empower Tanzania and Rotary Same Kilimanjaro. Supervision of drilling five boreholes at Katahe Hedaru, Masandare Same and Pangaro Mwanga District. The drilled depth is 180m and the 12”/10” diameters to facilitate running large casing of 8”/6” OD and the pump as well. The area produced large sums of water due to extensive fracturing within the formation. The borehole fitted with submersible pumps for village water supply. 4. Arusha urban Water Supply and Sewerage Authority (AUWASA). Two boreholes drilled in crystalline basement and volcanic rocks at Magereza Area. The drilled depth is 150m and 18” diameter to facilitate running large casing of 10” OD and the pump as well. 5. Drilling of two (2) high yielding boreholes at Mererani in Simanjiro. The yields are 100,000 litres per hour. 2003 – October 2013 Drilling Project Officer Iringa & Mbeya Regions Supervision and control execution of DDCA’s drilling projects in Iringa and Mbeya region. Among these; is water bottling plant (Maji Africa, Ihefu and Mbeya Spring). Asas Dairies Farm Ltd, Tanzam Highway Road Rehabilitation Project, Iringa - Dodoma Road Rehabilitation Project. Ruaha National Park, Iringa Drip Irrigation Schemes, School, Health, Orphan Centres as well as village and private water wells network. Exploratory and production drilling in Tunduma, Makambako, Rujewa, Chunya, Laela and Kyela for urban water supply services. 1999 – 2002 Drilling Project Coordinator Coast, Mtwara and Ruvuma Regions UNICEF - DDCA Cooperation for Well Drilling and Construction in Kisarawe, Rufiji, Masasi, Tunduru and Mbinga District. In this project, I performed the following works: 1. Drilled 120 productive wells, installation of pumps and preparation of well completion data. Training of two pump care takers per borehole. 2. Reporting progress as well as finance and supplies issues to UNICEF. 3. Supervision of Water well drilling at several villages in Pemba and Zanzibar. 1998 Regional Drilling Officer Iringa Control and supervise DDCA’s water well drilling projects in Iringa Region. Several wells drilled for rural communities for a safe and reliable water supply services. 1997 Drilling Supervisor Dar es Salaam City Augmentation of water supply The augmentation of water supply in Dar es Salaam City was planned to drill 500 water wells for drinking water. I was fully attached in this task force for all phases of the operation, mobilization of rigs and equipment to completion of drilling and test pumping of wells. The yield of wells was sufficient enough to increase the flow to the DAWASA network. 1995 - 1996 Regional Drilling Officer Iringa Region Control and supervise DDCA’s water well drilling projects in Iringa Region. Wells drilled for agricultural and dairy farms in Iringa district and as well as for Coal Exploration Project in Mchuchuma Ludewa Njombe Region. July 1994 Zonal Drilling Inspector Mwanza, Shinyanga, Kagera and Mara Regions Supervise, direct and control all drilling activities, Regional Drilling Coordinators, In - charge of drill rigs as well as coordinate with regional water authorities and responsible geologists, hydrogeologists, geophysicist, hydrologists and Senior Drilling Inspector and Senior Mechanical Inspector regarding drilling projects in the area. August 1990 – July 1994 Drilling Supervisor Mtwara Lindi Rural Water Supply Project I was appointed as Project Drilling Supervisor taking over from the Expatriates from Finland (FINNIDA). I continued to the closing of project in 1992 and preparations and transfer of project activities to Ministry of Water Drilling Section in 1993 – 1994. In 1993, drilling rig, compressors, equipment, vehicles, tools and other supplies officially handed over to the Ministry of Water Drilling Section and the project drillers employed by Ministry of Water as well. March 1986 – August 1990 Drilling Counterpart Mtwara Lindi Rural Water Supply Project Consultant: Finnwater Consulting Engineers, Finland Activities: Drilling of water wells and pumps installation to provide sufficient water supply for the rural communities in Mtwara, Lindi, Masasi, Newala, Nachingwea, Liwale and Kilwa Districts. Drilling of monitoring wells at Magumchila Well Field in Masasi Town. Well maintenance and rehabilitation at Magumchila Masasi, Kihue and Mkumbashamba Nachingwea and Mpara in Kilwa Masoko Well Field for Urban Water Supply System. Training of drillers and well & pump installers (at hand Ministry of Water and Irrigation employees) Order of drilling equipment, spare parts, tools, handpumps and consumables. Special Assignment Water Wells Drilling for Flood Victims in Lindi and Masasi District Activity Drilling water wells in those residents who live in areas affected by the floods. Project scope of work included drilling and installation of handpumps. The project funded by Irish People through Irish Red Cross. 1985 Driller Incharge Mtwara Urban Water Supply Project Consultant: German Water Engineering GmbH Activities: Drilled a number of deep exploration, piezometer and production wells in the Mtawanya Valley 8 km south east of Mtwara town. The boreholes are the only source of water for the Mtwara Municipality under the Urban Water Supply and Sanitation Authority. Test Pumping for the project and existing wells with the aim of obtaining information on hydrogeological parameters. 1984 Driller Incharge Ruvuma Region Drilling of production wells for the construction of the Makambako Songea Road Project. 1982-1983 Mbeya Region Driller In charge Village wells drilling program in Chunya, Mbarali and Mbozi District and drilling test holes in Mbozi District for Water Master Plan (Danida Water Project) Mbeya Region. August 1980 – 1981 Driller Mbeya Region Village wells drilling program in Mbozi District. Feb – July 1979 Driller Mbeya Region Drilled exploratory gas (carbon dioxide) wells at Kyejo Mbeya under the supervision of British Oxygen and Italian Drilling Experts. The Client was National Development Corporation (NDC). Sept – Dec 1978 Driller Dodoma District Drilled test boreholes to explore the possibilities of finding acceptable location for drilling production boreholes for the Dodoma Town (special emphasis placed for the Capital Development Authority CDA).

Industryschoolcourses

  • 2015, Constructing Safe and Sustainable Groundwater Wells, Mzuzu University Malawi, National Ground Water Research and Educational Foundation USA, Smart Centre Mzuzu University Malawi
  • 2010, Resource Drilling Fundamentals, Enid Oklahoma USA, Worldwide Drilling Resource USA, Sandford Fleming College CANADA, GEFCO USA
  • 2000, Maintenance of Deep Boreholes, Ibadan Nigeria, OPEC Vienna Austria, ARCEDEM Ibadan Nigeria
  • 1997, Borehole Pumps, Dar es Salaam Tanzania, Grundfos Denmark, Dynamic Drillers Tanzania
  • 1996, Entrepreneurship and Construction, VETA Iringa Tanzania, Danida Water Project Iringa, Mbeya, Ruvuma
  • 1990, Supervisory Management, Water Institute Dar es Salaam Tanzania, FINNIDA
  • 1991, Well Drilling and Air Compressor Maintenance, Kakamega (KEFINCO) Kenya, FINNIDA
  • 1986 - 1990, Training (in field) Well Drilling, Pump Installation and Maintenance, Mtwara Lindi Rural Water Supply Project, Finnwater Consulting Engineers Finland
  • 1978 - 1979, Training (in field) exploratory drilling of gas (Carbon Dioxide) wells, Kyejo Rungwe District, British Oxygen and Italian Oil/Gas Drilling Experts
  • 1979 - 1980, National Service /JKT Compulsory Terms

Membershipassociation

Sustainable Groundwater Development

Personal Information

  • Title: Master Driller/Pump Installer (Water Wells)
  • Date of Birth: 08/26/1958
  • Nationality: Tanzanian

Languages

  • Swahili (Mother Tongue)
  • English (Fluent)

References

  • Dr. Eng. Mohamed, A.H PhD, Drilling Consultant, Dar es Salaam, Tanzania, akbar2544@yahoo.com
  • Jonathan Mgaiwa, Geophysicist, Dar es Salaam, Tanzania, jslgaiwa@yahoo.com
  • Ronald A. Reed, Lawyer, Chico, CA, USA, 12 Jordan’s Place Chico, CA, mrron@sbcglobal.ne
  • David Bernard Songea, Master Driller, +255 713 340101, Dar es Salaam, Tanzania, dsongea@yahoo.com
  • Domina Msonge, Geologist, Ministry of Water and Irrigation, Dodoma, Tanzania, dmsonge@gmail.com
  • George John, Geologist, Drilling and Dam Construction Agency DDCA, P.O BOX 55658, Dar es Salaam, Tanzania, kamagwingiri@yahoo.com
  • Halili Shaban, Master Driller, Moshi, Tanzania, +255 754 384 763
  • Henry Tesha, Geologist, Mbeya, Tanzania, +255 754 470 709, henrytesha@yahoo.com

Hobbies and Interests

  • Reading
  • Travelling

Timeline

Zonal Manager (West Zone - Iringa, Mbeya, Rukwa, Katavi & Kigoma Regions)

Drilling and Dam Agency (DDCA)
10.2013 - 01.2018

Drilling Project Coordinator

Coast, Mtwara and Ruvuma Regions
01.1999 - 01.2002

Regional Drilling Officer

Iringa
01.1995 - 01.1996

Zonal Drilling Inspector

Drilling and Dam Agency (DDCA)
07.1994 - 01.1995

Drilling Supervisor

Mtwara Lindi Rural Water Supply Project
01.1990 - 01.1994

Drilling Counterpart

Mtwara Lindi Rural Water Supply Project
01.1986 - 01.1990

Driller - In -charge

Ministry of Water
01.1982 - 01.1985

Driller

Ministry of Water
01.1978 - 01.1981

Drilling Manager

Milembe Construction Construction Company Limited
2018 - Current

Driller Trainee -

Water Wells Drilling Technology and Drilling Equipment Maintenance

Certificate of Secondary Education -

Form 1- IV Tanga Secondary School
Ernest Mziray