Summary
Overview
Work History
Education
Skills
Languages
References
Hobbies and Interests
Languages
Training
BRIEF OF TASKS ASSIGNED
Timeline
Generic

EMMANUEL FIRMIN ITURUKE

DAR ES SALAAM

Summary

I am very dedicated individual with ambitions to explore new knowledge. Moreover, I can demonstrate a strong ability to ensure projects are completed successfully. A proactive individual with a logical approach to challenges, I perform effectively even within a highly pressurized working environment. Dedicated Team Leader with expertise in quality assurance initiatives, issue resolution and interpersonal communication. Proficient with project management, personnel training and production scheduling. Sets example for work ethic, punctuality and quality.

Overview

11
11
years of professional experience

Work History

Team Leader

EGYPRO EAST AFRICA LTD
DAR ES SALAAM
01.2020 - 06.2025

Supervised installation and configuration of TX equipment, ensuring timely project delivery.

Conducted site installations and commissioning of TX and RAN equipment for Ericsson project.

Diagnosed and troubleshot technical faults in transmission and radio access systems, minimizing downtime.

Collaborated with Huawei and Ericsson support teams to complete hardware installation on schedule.

Ensured compliance with telecom standards and safety protocols throughout project phases.

Performed Quality Audits post-installation and prepared Site Hand Over documentation for acceptance.

Coordinated team activities, delegating tasks to enhance project efficiency.

  • Maintained consistent communication with senior management regarding team progress and challenges.

Site Supervisor

Lepton Engineering
DAR ES SALAAM
03.2014 - 12.2019
  • Ericsson RBS swap 2k to 6k, Ericsson RBS installation and commissioning, full site installation, Ericsson MW link installation and configuration, Ericsson microcell installation, Ericsson MW link upgrade, transmission node swap, rectifier installation for microcell sites, site relocation, site acceptance, preparing site handover (SHO) documents, preparing site installation report, Ericsson RBS integration link swap, supervising EPA project, U900 activation.
  • MIC, Tanzania (Tigo)
  • Provided guidance and support to contractors on technical matters related to their scope of work.
  • Ensured that all personnel wore appropriate personal protective equipment while working at construction sites.
  • Ensured that workers followed safe work practices when operating machinery or performing hazardous tasks.

Education

in Electronics & Telecommunications Engineering - Electronics And Telecommunication

Arusha Technical College
Arusha,TanzaniaT
01.2013

Certificate of Secondary Education -

Jamhuri Secondary School
Dodoma,Tanzania
01.2008

Certificate of Primary Education -

Olboloti Primary School
Dodoma,Tanzania
01.2005

Skills

  • Computer literacy: MS Office and basic programming
  • Technical troubleshooting
  • Equipment installation and site commissioning
  • Quality auditing
  • Safety management
  • Problem solving
  • Working at height training
  • First aid awareness (Red Cross)
  • Software tools proficiency: Mini-Link Craft, OMT, Moshell, Web LCT, Eritop, SRS, SDA
  • Team supervision

Languages

English, Swahili

References

  • Hamphrey Obeid, project coordinator, EGYPRO EAST AFRICA Ltd, +255 655 100 456
  • Albert Abraham, project coordinator, Ericsson Tanzania, +255-717-037-475

Hobbies and Interests

Watching soccer, watching TV series, music, reading books, watching movies, Playing volleyball.

Languages

Swahili
First Language
English
Intermediate (B1)
B1

Training

  • Position: Trainee, Duration: 2013 May - July, Company: Ubungo Gas plant 1, Location: Tanzania, Task: Equipment maintenance and installation, Plc, Attending fault alarm, Routine gas leak test
  • Position: Trainee, Duration: 2012, May - July, Company: TANESCO, Location: Tanzania, Task: Equipment maintenance and installation(SCADA)
  • Position: Trainee, Duration: 2011, May-July, Company: TAZARA(Tanzania& Zambia rail way Authority), Location: Tanzania, Task: Telecommunication equipment maintenance (microwave, landline, trunk circuits)

BRIEF OF TASKS ASSIGNED

  • As a Site supervisor I am tasked with the following responsibilities:
  • (i) BTS commissioning.
  • (ii) New Microwave links installation and configuration.
  • (iii) Link upgrades (1+0 to 2+0 and 2+2)
  • (iv) Analyzing, troubleshooting & solving Radio Network problems.
  • (v) Materials handling starting from the point of source, ware housing to delivery on site.
  • (vi) Supervising people installing and configuring BTS and Microwave links.
  • (vii) Supervising site relocation and traffic migration.
  • (viii) Installation and commissioning of micro cell site.
  • (ix) BTS swap
  • (x) Conducting site survey for New sites
  • (xi) 3G installation and commissioning (Tigo project 2017)
  • (xii) Tower Relocation: Relocation of Tigo active equipment to new towers (Microwave and RF equipment)
  • (xiii) Mw dish swap: Mw dish size reduction

Timeline

Team Leader

EGYPRO EAST AFRICA LTD
01.2020 - 06.2025

Site Supervisor

Lepton Engineering
03.2014 - 12.2019

in Electronics & Telecommunications Engineering - Electronics And Telecommunication

Arusha Technical College

Certificate of Secondary Education -

Jamhuri Secondary School

Certificate of Primary Education -

Olboloti Primary School
EMMANUEL FIRMIN ITURUKE