Summary
Overview
Work History
Education
Skills
Accomplishments
Languages
Certification
Important Data's
Timeline
Generic

Arunkumar SELVARAJ

Trichy

Summary

Resourceful Constructor known for completing projects with efficiency and high productivity. Specialize in project management, safety compliance, and cost control, ensuring smooth workflow and timely completion of tasks. Excel in communication, problem-solving, and teamwork, leveraging these soft skills to lead projects to successful outcomes while maintaining strong relationships with clients and team members.

Overview

19
19
years of professional experience
1
1
Certification

Work History

Construction In-charge

Forges Tardieu
Kagera
09.2023 - Current
  • Fabrication and Erection of 140TPH Boiler with ESP and Chimney.
  • Coordinated phases of construction projects from inception to completion.
  • Inspected sites before and after construction projects.
  • Prepare the Site execution Planning according to availability of Manpower with equipment.
  • Read plans, instructions or specifications to determine work activities.
  • Met company and OSHA safety guidelines for work site operations to minimize worker risk.
  • Notified supervisors of faulty operations and defective materials to improve production.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Organize , Monitoring Canteen Activities and Dormitory.

Site Coordinator

EDM
Port Louis
06.2023 - 09.2023
  • Perform the hydrotest on the high-density polyethylene (HDPE) pipeline.
  • Coordinated with site manager to ensure the clearance of hydrotest with live line / Non-Line Line.
  • Prepare the schedule of works to complete the task within the time frame.
  • Prepare the timesheets to expose the HO/Client.

Site Engineer

EDCC
Port Louis
02.2022 - 09.2023
  • CEB Penstock - 2KM Pipe Line Installation on the uneven surface of the mountain.
  • To install the new pipeline (42") with VJ couplers.
  • Replacement of Old Pipe Line, before installing the new line.
  • Monitor the installation procedure like 'End-Rings, EPDM Gaskets, Sleeve, and Set-Gap Procedure' and Bolt-Tightening procedure while maintaining the Torque.
  • To provide proper pedestrians for pipelines for each foundation.
  • To ensure hydrotest, all couple joints should be tested before connecting the turbine.

Site Engineer

L&T Hydrocarbon Project
Ennuor
11.2020 - 01.2022
  • Conducted site surveys and analyses to identify construction requirements.
  • Prepared detailed engineering plans, drawings, and specifications for the project.
  • Developed cost estimates for materials and labor resources required for the project.
  • Ensured that all safety regulations were strictly adhered to during on-site operations.
  • Monitored progress of construction works against project timeline and milestones.
  • Resolved technical issues arising from design or installation problems encountered at the site.
  • Provided technical support throughout all phases of the project including pre-construction planning, procurement activities, commissioning and startup procedures.
  • Coordinated with other engineers and construction professionals to manage various stages of construction projects.
  • Guided projects to meet timescales, budgets and agreed specifications.

Site Engineer

Forges Tardieu
Cap-Tamarind
01.2020 - 10.2020
  • Prepare the Work Permit/Rigging Plan.
  • Prepared detailed engineering plans, drawings, and specifications for the project.
  • Developed cost estimates for materials and labor resources required for the project.
  • Supervised and monitored project subcontractors and labor force.
  • Managed use of materials and equipment to prevent property loss and support availability.
  • Answered technical concerns and devised solutions to resolve site and engineering problems.
  • Mobilize the Crane Activities and utilize economically.

Planning Engineer

MKRS
Kajang
07.2019 - 08.2019
  • Created presentations outlining key aspects of each project such as objectives, timelines.
  • Developed and maintained project schedules using MS Project software.
  • Organized and coordinated project meetings to review progress, discuss changes and provide updates.
  • Prepared detailed reports on cost estimates, labor requirements, material costs and other variables relevant to projects.
  • Coordinated with suppliers and subcontractors to ensure timely delivery of materials needed for projects.

Piping Engineer

KNPC
Mangaf
01.2018 - 05.2019
  • Prepare the Hot-work/Coldwork and rigging plan for everyday before execution of works.
  • Reviewed piping designs to ensure conformance with applicable codes and standards.
  • Coordinated the preparation of material specifications for all piping components.
  • Created isometric drawings for installation of new piping systems and modifications to existing systems.
  • Assisted in the development of project scope documents including cost estimates, schedules, and manpower loading requirements.
  • Resolved conflicts between different disciplines involved in a project relating to layout issues concerning space constraints or interferences with other systems.
  • Prepare the FDCR & TQ for Client Approval before proceeding with the Tie-In of various pipelines.

Site Supervisor

Zambia Sugar
Mazabukka
12.2015 - 06.2016
  • Organized daily workflow for the team, ensuring tasks were completed on time and within the frame.
  • Scheduled and coordinated resources for all maintenance activities in order to meet project deadlines.
  • Reviewed drawings, specifications, change orders and other documents associated with projects prior to start of work onsite.
  • Coordinated material deliveries from suppliers according to project needs.
  • Participated in job-site meetings with contractors, owners, architects, engineers, as necessary.
  • Controlled access at the site during working hours; monitored visitors' movements while they were on the premises.
  • Supervised projects to uphold schedule requirements and quality demands.

Supervisor

Zenith Engineering
Jookoon Circle
03.2012 - 03.2015
  • Directed and supervised team of 15 employees in daily operations.
  • To fabricate the various sewage tanks and install the wagons.
  • Maintained accurate records of employee performance, attendance, leave requests, and disciplinary actions.
  • Tracked progress on projects and provided timely feedback to staff members.
  • Ensured compliance with workplace safety regulations by providing training sessions for all staff members.
  • Reviewed completed work to verify consistency, quality and conformance.

Production Engineer

CU-Built Engineers
Pune
04.2010 - 02.2012
  • Developed and implemented production processes to increase efficiency and reduce costs.
  • Created detailed reports on production performance and made recommendations for process changes.
  • Monitored production operations to ensure compliance with safety regulations and quality standards.
  • Maintained accurate records of all activities related to production engineering.
  • Coordinated with suppliers to ensure timely delivery of components required for assembly operations.
  • Supervised daily operations in the factory ensuring that all tasks are completed according to schedule.
  • Evaluated vendor quotations for raw materials or parts; negotiated prices where necessary.

Supervisor

Mahalakshmi Engineering
Trichy
11.2005 - 02.2010
  • Directed and supervised a team of 35 employees in daily operations and gave safety instructions.
  • Maintained accurate records of employee performance, attendance, leave requests, and disciplinary actions.
  • Monitored employee productivity to provide constructive feedback and coaching.
  • To review Raw-Material Inspection, Group Certification.
  • NDT Inspection & evaluation
  • Prepare the WPS/WQR.
  • To create the records of job and make the COC.

Education

Bachelor of Engineering - Mechanical

Anna University
Trichy
05-2007

High School Diploma -

Sastra University
Vallam
04-2003

Some College (No Degree) - ASNT LEVEL-II

Vaigai Counsultancy
Trichy

Some College (No Degree) - AutoCAD

BDPS Computer Education
Thiruverumbur

Skills

  • Scheduling Coordination
  • Materials Procurement
  • Team-oriented and dependable
  • OSHA
  • Site preparation
  • Worksite safety
  • Construction
  • Materials Loading
  • Blueprint Reading
  • Worksite preparation
  • Making Good Planning with available resource
  • Rigging Activities
  • Permit Preparation
  • making Simple Drawing with CAD
  • System orient works

Accomplishments

  • Good Execution Awarded by KNPC Projects.
  • Timidly Completion awarded by Super-U project.

Languages

Tamil
First Language
English
Upper Intermediate (B2)
B2
Hindi
Upper Intermediate (B2)
B2

Certification

  • Fabrication and Erection of all the steel made items.

Important Data's

  • Alternate Phone No : + 91 9750885519
  • Date of Birth : 03-Nov-1983
  • Marital Status : Married
  • Passport No : U1125592
  • Date of Issue / Expiry : 26-11-2019 / 25-11-2029

Timeline

Construction In-charge

Forges Tardieu
09.2023 - Current

Site Coordinator

EDM
06.2023 - 09.2023

Site Engineer

EDCC
02.2022 - 09.2023

Site Engineer

L&T Hydrocarbon Project
11.2020 - 01.2022

Site Engineer

Forges Tardieu
01.2020 - 10.2020

Planning Engineer

MKRS
07.2019 - 08.2019

Piping Engineer

KNPC
01.2018 - 05.2019

Site Supervisor

Zambia Sugar
12.2015 - 06.2016

Supervisor

Zenith Engineering
03.2012 - 03.2015

Production Engineer

CU-Built Engineers
04.2010 - 02.2012

Supervisor

Mahalakshmi Engineering
11.2005 - 02.2010

Bachelor of Engineering - Mechanical

Anna University

High School Diploma -

Sastra University

Some College (No Degree) - ASNT LEVEL-II

Vaigai Counsultancy

Some College (No Degree) - AutoCAD

BDPS Computer Education
Arunkumar SELVARAJ