Diligent and experienced Civil Quality Control Manager with a proven track record in overseeing and maintaining high construction standards. Proficient in developing and implementing comprehensive quality control plans, ensuring adherence to project specifications, codes, and industry regulations. Adept at managing quality inspection processes, collaborating with cross-functional teams, and addressing issues proactively to ensure project success. Possess strong leadership skills to guide quality control teams, optimize construction workflows, and consistently deliver projects of superior quality.
Project: JNHPP 2115 MW, Tanzania. JNHPP is developed for power generation and flood control with a total capacity of 2,115 MW (09 Units, 235 MW each) and annual power generation of 6,307 GWh. The reservoir has a full supply level of 184.00 m asl and gross storage capacity of 32.8 BCM. The Project layout consists of: Roller Compacted Concrete (RCC) Gravity Dam; Main Spillway which is gate controlled Ogee; Four Saddle Dams (3 Embankment type, 1 RCC) on the right bank; Emergency Spillway on Saddle Dam No. 1; Three separate Power Waterways including Intake, HRT, Surge Tank and penstocks; Ground Powerhouse on the right bank; Switchyard on left bank. Max. power discharge is 2367 m3/s with the following responsibilities:
Project:
Construction of Port said tunnel under Suez Canal project.
Description:
Two tunnels for cars, the first tunnel from Port Said to Sinai and the other is vice versa. The total length of the tunnel is 3930m and reached to 4830 by adding the entries and exits; it includes 2 lanes with 3.60m and the maximum depth is 57m under the Suez Canal. The external diameter of the tunnel reached about 12.6m; the internal diameter is 11.4m with a height of 5.5m from the surface level. Diaphragm walls were installed inside the tunnel with a depth of 70m. The tunnel has 2 horizontal emergency exits for each 1000m; besides the tunnel has 35 fans in addition to the fans inside the emergency tunnels and the lighting systems which installed according to the international standards. the Total Budget of the project is 17,000,000,000 EGP
Roles and responsibilities:
Project:
Construction of The Headquarters of The Attorney General and Offices Attached.
Description:
Constructed on an area of 20,000 square meters, the building comprises a basement, ground floor, and three upper levels. It is equipped with state-of-the-art fire and alarm systems, and includes a cooling station with a capacity of 1,950 tons, as well as an electrical station with a capacity of 5.3 megawatts. The facility boasts parking garages accommodating over 600 vehicles, a dome with a diameter of 16,000 meters, GRC facades, granite and porcelain flooring, suspended ceilings with a total budget of 260,000,000 EGP.
Roles and responsibilities:
Project:
Renovation and Renewal of Al-Ahli Bank Tower - Cairo Plaza
Describtion:
Rehabilitation and Transformation of the North Tower of Al- Ahli Bank - Cairo Plaza from hotel apartments to administrative Offices. The property's function is enhanced by adding four additional elevators, increasing the total number of elevators in the tower to eight the core is constructed from the foundation level up to the 37th floor. several types of finishing is used such as ,marble cladding and flooring, ceramic tiles, aluminum cladding, wooden doors, ceramic tiles, raised floor,...
the project budget is 350,000,000 EGP
Roles and responsibilities:
Project:
British School Project
Describtion:
With a total construction cost of EGP 110 million, the project is constructed on a total land area of 7,031 m2.
The school comprises 36 classes distributed over four floors [ground floor (6,399 m2), first floor (5,063 m2), second floor (5,237 m2) and third floor (1,879 m2)], in addition to 240 m2 playground.
The school’s state-of-the-art facilities include air-conditioned classrooms, a large swimming pool, labs, a sports hall, sports fields and a multi-purpose hall.
The total construction cost is 110 million EGP.
Roles and responsibilities: